Sheet index

816-775-9831JasonDavisDesign@gmail.com

7:00 am – 5:00 pm Central Time, Monday – Friday

Budgetary rates

Tiered pricing, published up front

Four cumulative tiers, from a processed point cloud to a full CAD drawing package, priced from one published rate sheet. Run your own numbers in the estimator below.

Rate sheet

Four tiers, one published rate sheet

Pick the highest tier you need and everything below it comes along. Scanning is priced per square foot, modeling as a per-square-foot add-on, and drawings as a fixed fee.

  1. Tier 1: Existing-Condition Scan

    Accessible agreed areas; processed point cloud, basic cleanup, alignment, quality checks, and coverage limitations.

    $0.12 – $0.35 / sq. ft.

    $2,500 project minimum

  2. Tier 2: Building Model

    Tier 1 plus visible floors, walls, ceilings, roof geometry, stairs, doors, and building-access ladders.

    Tier 1 + $0.30 – $0.60 / sq. ft.

    $3,000 minimum modeling add-on

  3. Tier 3: Building & Process Model

    Tier 2 plus equipment, associated piping, mezzanines, access ladders, and guardrails within the agreed scope.

    Tier 2 + $0.60 – $1.50 / sq. ft.

    $5,000 minimum process-modeling add-on; high congestion quoted separately

  4. Tier 4: Existing-Condition CAD Drawing Package

    Tier 3 plus agreed plans, equipment layouts, mezzanine plans, elevations, sections, tags, and layout dimensions.

    Tier 3 + fixed drawing fee

    Starting at $3,500; based on the agreed sheet list and detail required

Service tiers with budgetary rates and minimums
TierScopeRate
Tier 1: Existing-Condition ScanAccessible agreed areas; processed point cloud, basic cleanup, alignment, quality checks, and coverage limitations.

$0.12 – $0.35 / sq. ft.

$2,500 project minimum

Tier 2: Building ModelTier 1 plus visible floors, walls, ceilings, roof geometry, stairs, doors, and building-access ladders.

Tier 1 + $0.30 – $0.60 / sq. ft.

$3,000 minimum modeling add-on

Tier 3: Building & Process ModelTier 2 plus equipment, associated piping, mezzanines, access ladders, and guardrails within the agreed scope.

Tier 2 + $0.60 – $1.50 / sq. ft.

$5,000 minimum process-modeling add-on; high congestion quoted separately

Tier 4: Existing-Condition CAD Drawing PackageTier 3 plus agreed plans, equipment layouts, mezzanine plans, elevations, sections, tags, and layout dimensions.

Tier 3 + fixed drawing fee

Starting at $3,500; based on the agreed sheet list and detail required

Modeling and drawing minimums are additional fees. Process-modeling rates apply only to the agreed process area. Drawing packages are priced as a fixed fee based on scope.

Full scope and deliverables by tier

Tier 1 scanning rate by area type

One rate per square foot, set by how congested the space is.

Tier 1 scanning rate by area type
Area typeTier 1 rate
Open industrial spaceWarehouses and limited obstructions$0.12 / sq. ft.
Standard industrialEquipment areas and moderate piping$0.20 / sq. ft.
Dense processMechanical rooms and congested piping$0.35 / sq. ft.
Complex access or multilevel processMultilevel process structures, dense multilevel pipe racks, or restricted accessCustom quote
Over 100,000 sq. ft.Any area typeCustom quote

$2,500 project minimum

Leica RTC3601.9 mm @ 10 mHow accuracy works

† Leica manufacturer specification (68% confidence, 89% albedo). An instrument figure, not a project tolerance.

What the rates cover

Billable area, modeling scope and exclusions are set out once, in the scope rules on the services page.

Fabrication-critical tie-ins, flange locations, anchor bolts, and tight-clearance dimensions need separate verification before fabrication or installation, quoted separately. Verification rule

Budgetary starting rates; a written proposal establishes final scope and price.

Budget estimator

Estimate your project

Enter the billable area, the area type and the highest tier you need. The figures come from the rate sheet above and update as you go.

Add each floor or platform that needs separate capture. Over 100,000 sq. ft. is custom quoted.

Area type

Sets the Tier 1 scanning rate.

Highest tier needed

Lower tiers are included automatically.

Tier 3 — Building & Process Model

Tier 2 plus equipment, associated piping, mezzanines, access ladders, and guardrails within the agreed scope.

The part of the area that gets equipment and piping modeling. Leave blank to use the total area; cannot exceed it.

Using the total area (10,000 sq. ft.).

Site within 50 driving miles of Harrisonville, MO?

Budgetary estimate

$11,500 – $23,500

Range at the published rates. The written proposal sets the final price.

10,000 sq. ft. · Standard industrial · Tiers 1–3 · Within 50 driving miles

Line items by tier
TierQuantityRateAmount
Tier 1Standard industrial scanning10,000 sq. ft. × $0.20/sq. ft.10,000 sq. ft.$0.20/sq. ft.$2,500Minimum applies
Tier 2Building modeling add-on10,000 sq. ft. × $0.30–$0.60/sq. ft.10,000 sq. ft.$0.30–$0.60/sq. ft.$3,000 – $6,000
Tier 3Process-modeling add-on10,000 sq. ft. × $0.60–$1.50/sq. ft.10,000 sq. ft.$0.60–$1.50/sq. ft.$6,000 – $15,000
Tier 4CAD drawing packageNot included
  • High-congestion process areas are quoted separately.
  • Includes one scheduled mobilization within 50 driving miles of headquarters.
Download as PDF

A one-page budgetary estimate you can keep or forward.

Worked example

10,000 sq. ft. of dense process area, all four tiers

The same math the estimator runs, computed from the published rates.

Totals add each line’s low figures and each line’s high figures, giving a range. The Tier 4 drawing fee is a starting figure, so a total that includes drawings shows only the low sum, as “From.”

Final drawing fee depends on the agreed sheet list, number of views, and level of detail. Includes one consolidated customer review round; additional views, scope changes, and subsequent revisions are quoted separately.

Line-item estimate

10,000 sq. ft. billable area · Dense process · process area 10,000 sq. ft. · Tiers 1–4 · site within 50 driving miles

Sheet
DDG-400
Rates dated
September 21, 2026
Currency
USD
Worked example line items
ItemAmount
Tier 1Dense process scanningExisting-Condition Scan10,000 sq. ft. × $0.35/sq. ft.$3,500
Tier 2Building modeling add-onBuilding Model10,000 sq. ft. × $0.30–$0.60/sq. ft.$3,000 – $6,000
Tier 3Process-modeling add-onBuilding & Process Model10,000 sq. ft. × $0.60–$1.50/sq. ft.$6,000 – $15,000
Tier 4CAD drawing packageExisting-Condition CAD Drawing PackageFixed fee · Based on agreed sheet listFrom $3,500
Tiers 1–3 subtotal
$12,500 – $24,500
Tier 4 CAD drawing package
From $3,500
Budgetary total
From $16,000

Notes

  1. High-congestion process areas are quoted separately.
  2. The drawing fee is fixed once the sheet list, views, and level of detail are agreed.
  3. Includes one scheduled mobilization within 50 driving miles of headquarters.

Hourly & field rates

Design support, travel and added field work

Work beyond a scan package, such as industrial drafting, mechanical design and technical documentation, is billed hourly from the professional fee schedule. Field additions follow the policies here.

Hourly design & engineering support

Effective January 1, 2026 · Hourly rate based on a 40-hour week

Hourly rates, effective January 1, 2026
RoleRate
Mechanical DesignerIndustrial drafting & design services$80 / hr
Sr. Mechanical DesignerSenior-level system design & management$95 / hr
Engineering SupportTechnical documentation$120 / hr
Outside Professional EngineeringLicensed professional consultation$185 / hr
Overtime (over 40 hrs / week)1.5× base
Legal holidays2.5× base

Travel & additional services

Mobilization and field additions for scan packages.

Local mobilization
One scheduled visit within 50 driving miles of headquarters included
Additional travel, overnight expenses, or mobilizations
Quoted before scheduling
Client-caused standby beyond agreed allowance
$175 / hour per scanning operator
Added field work outside original scope
$2,000 / day; up to 8 hours, one operator and scanner; processing quoted separately
Lifts, escorts, extra personnel, survey control, or precision verification
Separately quoted

Terms & hours

Standard terms from the 2026 professional fee schedule. The written proposal confirms them for each project.

Billing
Services and expenses are invoiced monthly, due Net 30 from the invoice date.
Notice
We request five working days’ notice before the start date.
Hours
7:00 am – 5:00 pm Central Time, Monday – Friday
Excluding holidays
Travel for hourly work
Travel outside the Kansas City metro is billed at straight time. Lodging, meals, and specialized rentals are billed at actual cost.
Scan packages follow the mobilization policy under Travel & additional services.
Insurance
Standard contractor liability and workers’ compensation coverage is included for Davis Design Group employees. Special insurance, permits, and certificates, if required, are billed as extra.

Ready for a written proposal?

Send the area, the facility type, and the tier you need. The proposal confirms scope, deliverables, and price before any field work.